Objectives for WP1

The main goal of WP1 is to deploy an efficient governance structure guaranteeing the overall coordination of the project and coordination among WPs and tasks, thereby contributing to the achievement of objectives and to the delivery of high-quality results within the established timeframe and budget. All the project partners will be highly involved in all tasks of WP1.

Description of work

  • 1.1: Project coordination and consortium management
  • 1.2: Administrative and financial management
  • 1.3: Risks and ethical issues management
  • 1.4: Stakeholder Engagement

 

Deliverables

  • 1.1: Project Management Plan - first version
  • 1.2: Project Management Plan - second version
  • 1.3: Risks and ethical issues monitoring report
  • 1.4: Stakeholder Engagement Report

Visit: Danish team to the Netherlands

The Danish project team from Aalborg University and Green Hub Denmark visited the Netherlands, hosted by the Hanze University of Applied Sciences and the Municipality of Leeuwarden. A very productive knowledge exchange took place regarding PEDs and 'barriers to PEDs'.

 

A number of site visits and workshops have been held. Including a visit to the Zwette industrial estate in Leeuwarden, a presentation by the district electricity operator Liander about congestion in Leeuwarden, a visit to Warmtestad Groningen, a workshop on heating networks in Denmark and the Netherlands, and a modeling workshop to gain hands-on experience with the HUAS modelling tools and methods.

Mitigating Grid Congestion with Flexibility Solutions

 

The electrical grid congestion here is a major challenge. This is complicating the expansion or renewable energy generation, as well as the connection of new businesses to the grid. Realization of grid expansion is still years away.

 

Flexibility options investigated to mitigate congestion prior to the further grid expansion are: peak shifting of electrical load, energy sharing synergies between local companies and district heating/cooling.

Aerial photo of Leeuwarden, de Zwette Industrial estate

Site visit to it Swettehus

 

Site visit to it Swettehus, from where the many bridges in the province are controlled. It Swettehus has an almost self-sufficient energy system with solar power generation and battery storage. The heating of the building is using aquathermal energy from the adjacent canal.

Site visit to it Swettehus

Site visit to groningen warmtestad district heating facility

 

Site visit to the District heating facility of Groningen Warmtestad. District heating is a way to bring more flexibility into the energy system and mitigate grid congestion.

Visit: Dutch team to Denmark

The Dutch team from the Hanze University of Applied Sciences and The New Energy Coalition visited Aalborg in Denmark.

 

A full and exciting program was prepared by the hosts from Aalborg University and Green Hub Denmark. A variety of presentations, workshops and site visits gave the project partners a good appreciation of the challenge at hand. The main objective for Aalborg East is to become 100% sustainable energy sourced for the local energy system and district heating. Opportunities for industrial symbioses as well as synergies with local housing communities are being investigated.

Aalborg city overview

 

Aalborg city with 144,744 inhabitants is a university city with a legacy of industry with shipyards, a cement factory, tobacco and textile industry, located strategically on the fjord. The city is heated by a district heating system which is fuelled by industrial residual heat from the Portland factory and the waste incineration plant Nordvӕrk as well as the coalfired combined heat and power plant of Aalborg Forsyning.

City of Aalborg

Visit at Aalborg Portland

 

Aerial photo of Aalborg East, Industrial estate and the Aalborg Portland cement factory which provides waste heat to the city district heating. The plant has a significant carbon footprint.

 

Visit at Aalborg Forsyning

 

The local coal fired combined heat and power plant Aalborg Forsyning is currently providing > 50% of the heat for the city's district heating. The coal plant is being decommissioned and more sustainable heat sources will be derived from Power to X and large sea water heatpump.

 

Aalborg Utilities

Visit at Himmerland Housing Association

 

The team visited the housing estate of the Himmerland Housing Association, where an integrated urban and energy rejuvenation is being implemented.

Aalborg East